This project consists of replacing the Water Treatment Plant’s existing filter package units, which have reached the end of their useful life. This project will replace the existing individual metal packaged filter units with a structural concrete housed filter unit and a capacity of ten (10) MGD. The replacement of the package filters will provide the Water Plant with a reliable means of providing the required filtration at a greater capacity. An increased capacity will also be required in the very near future as the population of the City grows. The new ten (10) MGD filters will have the ability to provide the required capacity for at least another thirty (30) years.
| DISTRICT: | All Districts |
| ESTIMATED START DATE: | On Hold |
| ESTIMATED COMPLETION DATE: | On Hold |
| ESTIMATED COST: | $7,400,000.00 |
STATUS: No Longer Accepting Bids. This Project is On Hold.