NW 94th Ave Crosswalk & Roadway Drainage Improvements Project

This in-house design project includes the redesign of NW 94th Avenue in front of Challenger Elementary and Millenium Middle School to include: two new raised school crosswalks (i.e. speed table traffic calming measures) at the intersection of NW 57th Street and  8 NW 58th Street with truncated dome ADA Ramps; centerline traffic separators, with mid-crossing ADA truncated domes, to control the traffic flow within this corridor; modifications to the existing bike path system to support the raised school crosswalks and associated pavement markings and signage. Also, due to the extremely poor soil percolation conditions in this area, the landscaping medians are holding water and excess water is seeping into the roadway limerock base, causing excessive asphalt rutting and premature asphalt deterioration. This project will include the installation of drainage improvement, including infiltration trench pipe, drainage structures and associated work within the existing landscape medians; removal of existing asphaltic concrete pavement and resurfacing at NW 94th Avenue.

DISTRICT:District 2
ESTIMATED START DATE:Spring 2025
ESTIMATED COMPLETION DATE:Fall 2025
ESTIMATED COST:$1,111,469.76
STATUS:COMPLETED


Project Development Roadmap

Note: Explore the journey — click on each milestone to see what’s been accomplished.

Project Approval
The Project has been approved
Project Progress Update
Median, ADA, drainage, irrigation progressing
Roadway Resurfacing and Crosswalk Installation Underway
Resurfacing and crosswalks in progress
Finalizing Site Work
Contractor finalizing site work, on track for school-year completion.
Project Approval
Project approved during February 26, 2025, City Commission meeting.
Project Progress Update
The contractor has completed all the median work and ADA ramps. Drainage improvement activities began 4/28 and are ongoing. Irrigation work is also underway in preparation for landscape installation.
Project Progress Update
Roadway Resurfacing and Crosswalk Installation Underway
Roadway resurfacing is underway, along with installation raised crosswalks. Roadway is scheduled to be fully reopened by the end of July.
Roadway Resurfacing and Crosswalk Installation Underway
Finalizing Site Work
The contractor is finalizing the installation of turf block, landscaping, paving and lighting. The contractor anticipates achieving substantial completion of the project prior to the start of the school year.